MB1B in SAP: Transfer Posting & Movement Types

โšก Smart Summary

Transfer Posting of Goods in SAP moves stock between storage locations, plants, or stock types without changing total inventory. Transaction MB1B with movement type 311 handles a storage location move in one step.

  • ๐Ÿ”€ Core Definition: A transfer posting relocates or reclassifies stock; the total quantity owned stays unchanged.
  • ๐Ÿงพ Two Transactions: MB1B is the dedicated transfer transaction; MIGO does the same work through action A08.
  • ๐Ÿ”ข Movement Type 311: Moves quantity from one storage location to another inside the same plant, in a single step.
  • ๐Ÿ“ฅ Required Entries: Receiving storage location, material number, quantity, and unit of measure complete the posting.
  • ๐Ÿ“„ Document Created: Saving assigns a material document number that serves as the reversal reference.
  • โ†ฉ๏ธ Reversal Path: MBST or MIGO cancels the posting using that material document number.

Transfer posting in SAP using MB1B

What is Transfer Posting in SAP MM?

A transfer posting changes where stock sits or what category it belongs to, without altering how much of it the company owns. Nothing enters or leaves the business, which is what separates it from a goods receipt or a goods issue.

Three kinds of change fall under the term:

  • Location change: Quantity moves between storage locations inside a plant, or between plants within the same company code.
  • Stock type change: Quantity moves between unrestricted use, quality inspection, and blocked stock while staying physically in place.
  • Material change: Quantity is rebooked from one material number to another, used when a part is reclassified.

Some transfer postings move physical goods and some are purely a change of status in the system. Both produce a material document, and a valuated move between plants also produces an accounting document because the stock account differs by plant.

Transferring a quantity from one storage location to another can be accomplished by either using MIGO transaction or MB1B.

I will demonstrate the transfer posting process using MB1B as you have already seen MIGO in action in the goods receipt tutorial.

Transfer Posting Process in SAP

Step 1)

  1. Execute the transaction MB1B.
  2. Enter movement type (311), source Plant and Storage location. Hit ENTER.

Transfer Posting of Goods in SAP MB1B

Step 2)

  1. Enter receiving storage location,
  2. material number,
  3. quantity,
  4. unit of measure.

Save the document and the transfer posting will be completed.

Transfer Posting of Goods in SAP MB1B

The material document number is assigned.

Transfer Posting of Goods in SAP MB1B

If you need to cancel this posting, you can use either MBST or MIGO transaction.

๐Ÿ’ก Tip: Check the result in MMBE straight after saving. It shows quantity by plant, storage location, and stock type on one screen, which confirms the move landed where it was intended.

Transfer Posting Movement Types

The movement type is the single most important entry on the screen. It tells SAP what kind of move this is, which accounts to touch, and which fields to demand.

Movement Type Movement Steps
311 Storage location to storage location within one plant One step
313 / 315 Storage location to storage location, removal then placement Two step
301 Plant to plant transfer One step
303 / 305 Plant to plant, remove from storage then place in storage Two step
309 Material to material transfer One step
321 Quality inspection stock to unrestricted use One step
322 Unrestricted use to quality inspection stock One step
343 Blocked stock to unrestricted use One step
344 Unrestricted use to blocked stock One step

One step and two step differ in what happens between the ends of the move. A one step posting takes stock out of the source and puts it into the destination in a single document. A two step posting places the quantity into stock in transfer, where it is visible but unavailable, until the receiving location confirms arrival. Two step is the honest choice when goods spend real time on a truck.

Movement type 321 is also how quality inspection stock is released after a usage decision in SAP QM.

Transfer Posting vs Stock Transport Order

Moving material between plants can be done two ways, and the choice affects planning, costing, and paperwork.

Parameter Transfer posting Stock transport order
Document created Material document only Purchase order, delivery, and material documents
Visible to planning No, the move is invisible until posted Yes, the receiving plant sees it as incoming stock
Delivery and shipping Not supported Supported through outbound delivery
Effort One screen Full order to receipt cycle
Best for Corrections and short internal moves Planned inter plant supply over distance

As a rule, use a transfer posting when the move is immediate and internal, and a stock transport order when the receiving plant needs to plan around the incoming quantity. Where the underlying problem is a wrong receipt rather than a wrong location, reverse it instead as described in cancelling a goods receipt. The wider process is covered in the SAP MM tutorial series.

FAQs

Only when the valuation changes. A move between storage locations in one plant does not, while a plant to plant move or a material to material transfer usually does.

Whenever goods spend meaningful time in transit. The quantity sits in stock in transfer, visible but unavailable, until the receiving location confirms arrival with the second posting.

AI compares demand forecasts across plants and recommends rebalancing moves before a shortage forms, turning transfer posting from a reactive correction into a planned action.

Yes. Models learn which movement types a plant normally uses for a material and warn when an unusual combination appears, which prevents stock landing in the wrong category.

Usually because the source stock type holds less than requested. Check MMBE for the exact quantity in that storage location and stock type before retrying the posting.

Summarize this post with: