ME58 in SAP: How to Create PO with Reference

โšก Smart Summary

Purchase Order with reference in SAP copies items from an existing document instead of retyping them. Transaction ME21N adopts a requisition, quotation, contract, or earlier order through the document overview panel.

  • ๐Ÿ“„ Reference Sources: Requisition, RFQ, quotation, contract, another purchase order, and sales order can all serve as the source document.
  • ๐Ÿ›ฃ๏ธ Two Routes: ME58 works from a buyer worklist, while ME21N references any document directly through the document overview.
  • โš™๏ธ ME58 Behaviour: Selecting process assignment calls ME21N, so the order is always built in the same transaction.
  • ๐Ÿ”Ž Selection Variant: In ME21N the selection variant button chooses which document type the overview panel will search.
  • โž• Adopt Button: Adopt transfers the selected items into the new order, ready for review before saving.
  • ๐Ÿท๏ธ Order Type Check: Confirm NB or the required type plus date, purchasing group, and organisation before continuing.
  • ๐Ÿ” Universal Pattern: The same sequence applies to every reference type; only the document type selected in the variant changes.

Create purchase order with reference in SAP using ME58

Purchase order with reference

Purchase orders can be created with reference to a purchase requisition, RFQ, quotation, another purchase order, contract, sales order etc. To reference a PO to a previous document you can use the appropriate function. You can create a PO referencing a previous document in 2 ways

  1. Using ME58
  2. Using ME21N

Which Reference Documents Can a Purchase Order Use?

Referencing is not limited to requisitions. Each source document carries different information into the order, which is why the choice affects how much still has to be typed.

Reference Document What it contributes Typical situation
Purchase requisition Material, quantity, plant, delivery date, account assignment Standard demand driven procurement
RFQ or quotation Vendor, agreed price, conditions, delivery terms After a bidding round has been decided
Contract Agreed price, target quantity or value, validity period Calling off against a negotiated framework
Scheduling agreement Delivery schedule lines and agreed conditions Repetitive supply with fixed intervals
Another purchase order Every item, quantity, and condition of the earlier order Repeat purchase with no changes
Sales order Customer requirement and delivery address Third party and individual purchase order scenarios

Where a decided quotation exists, referencing it rather than the original requisition carries the negotiated price into the order automatically. The quotation selection tutorial covers how that price is confirmed.

Referencing through ME58

In our case if we want to create a PO for a Purchase requisitions, we can use the transaction code ME58. I will demonstrate the process starting from ME58 as it calls the ME21N and you can see that actually we create a PO in ME21N anyway.

Step 1)

  1. Enter t-code ME58.
  2. Choose Vendor and purchasing organization and
  3. Select document types.
  4. Execute.

Purchase order with reference

Step 2)

  1. Choose the line for your vendor.
  2. Select process assignment.

Purchase order with reference

Step 3) Make sure that on the next screen the selected order type is NB (or other appropriate type which you wish to use at this moment). Date, purchasing group and organization also need to be checked before clicking the check button.

Purchase order with reference

Step 4) You will be redirected to the transaction ME21N by the system where you will be able to choose the requisition you want to use as a reference document for PO.

  1. Choose PR number you want to use as a reference document.
  2. Select the Adopt button.

Purchase order with reference

Step 5) You can see that our item has been transferred to new purchase order. You can now save it, and it will be assigned a document number.

Purchase order with reference

Referencing through ME21N

Creating a PO directly from ME21N referencing to any suitable document is the fastest and least complicated way to do so. If you want to skip the ME58 or any other not needed step, you can create a PO using ME21N directly. This is mostly used by the MM users, and the process is as it is described below –

Step 1)

  1. Enter the transaction ME21N.
  2. Choose the “Document Overview ON” (if document overview isn’t open already).

Referencing through ME21N

Step 2) In the document overview screen, you can choose which document you will use for referencing purposes.

  1. Choose the Selection Variant button.
  2. Choose the document type for which you want to reference your PO.

Referencing through ME21N

Step 3) On the selection screen enter your PR name (or find it by any other data โ€“ e.g. vendor, material number).

Execute the search.

Referencing through ME21N

Step 4) You are presented a screen with the documents relevant to your search.

  1. Click the document number you want to use as a reference document.
  2. Choose to Adopt the document.

Referencing through ME21N

You are done, now you can save your PO or make additional changes. The referencing process is the same for any other reference document type. Just follow the steps above except choosing the appropriate document type in Step 2.

ME58 vs ME21N: Which Route to Choose

Both routes end in the same transaction, so the difference is how the source document is found rather than how the order is built.

Parameter ME58 ME21N direct
Starting point Worklist of assigned requisitions grouped by vendor Empty order, source found through document overview
Source required on the requisition Yes, the item must already carry a source of supply No, the vendor can be typed on the order header
Reference types supported Purchase requisitions only Requisition, RFQ, quotation, contract, order, sales order
Best for Clearing a daily buyer worklist by vendor Ad hoc orders and any non requisition reference
Speed for a single order Slower, two selection screens first Faster, one search in the overview panel

For volume work without manual review, ME59N converts assigned requisitions automatically in the background. That path is described in converting a requisition into a purchase order.

What Is Copied and What Is Not

Adopt does not clone the source document. SAP copies the demand and then re-derives the commercial terms from master data, which explains the differences buyers notice after pressing the button.

Copied from the reference document:

  • Material number, short text, and material group
  • Quantity, plant, storage location, and delivery date
  • Account assignment category and its cost object
  • Requirement tracking number and item texts

Re-derived from master data, not copied:

  • Net price and pricing conditions, read from the info record or contract
  • Order unit, which can round the requested quantity up or down
  • Payment terms, incoterms, and currency, read from the vendor master
  • Over and under delivery tolerances and goods receipt processing time

Two checks prevent most surprises. Compare the adopted quantity against the request, because a pallet order unit will reshape a figure entered in pieces. Then compare the net price against the expectation, since a missing purchase info record leaves the field at zero and the order cannot be saved. Corrections after saving are made in change purchase order.

FAQs

Yes. Adopt items from as many requisitions or contracts as needed, provided they share the vendor, purchasing organisation, and currency of the order header.

Yes. Quantity, delivery date, and price remain editable until the order is saved. The link to the source document is kept regardless of the changes made.

AI suggests which source document to adopt by matching open requisitions and contracts to the current demand, and groups items that can share a single order to reduce document count.

Yes. Models compare the adopted quantity, price, and delivery date against historical orders for that material and vendor, flagging values that fall outside the normal range for review.

ME58 lists only requisitions that already carry an assigned source of supply and are released. Assign a source in ME57 first, or reference the requisition directly through ME21N.

Summarize this post with: