ME51N in SAP: How to Create Purchase Requisition (PR)

โšก Smart Summary

Create a Purchase Requisition in SAP using transaction ME51N. The document records an internal need for material, carries a document type and quantity, and converts into a purchase order once released.

  • ๐Ÿงพ Core Transaction: ME51N creates the requisition; the older ME51 still exists but is not recommended for new work.
  • ๐Ÿท๏ธ Document Type: NB is the standard requisition type and decides number range, field selection, and release behaviour.
  • ๐Ÿ” Source Determination: Switching the flag on lets SAP propose a vendor from the source list, contract, or info record.
  • ๐Ÿ“ฆ Item Essentials: Material number, quantity with unit of measure, plant, storage location, and delivery date are the minimum entries.
  • ๐Ÿ’ฒ Valuation Price: Copied from the material master when maintained; otherwise it must be typed in manually before saving.
  • ๐Ÿ”— Tracking Number: An optional requirement tracking number links the requisition to related documents for later reporting.
  • โžก๏ธ Next Step: Saving assigns the document number, after which release opens the path to purchase order creation.

Create a Purchase Requisition in SAP using ME51N

What is a Purchase Requisition in SAP?

A purchase requisition is an internal document that asks the purchasing department to procure a defined quantity of a material or service by a given date. It commits nothing to a supplier. It simply records a demand and routes it for approval.

Requisitions reach the system by two routes. Planning runs such as MRP or consumption based planning create them automatically as procurement proposals, and users create them manually in ME51N when a need falls outside the planning cycle. Both routes produce the same document type and follow the same release path.

Three attributes decide how the document behaves:

  • Document type: NB is the delivered standard. Others exist for subcontracting and stock transfer, each with its own number range and field selection.
  • Account assignment category: Blank for stock material. Categories such as cost center or asset are used when the item is consumed directly rather than put into inventory.
  • Release strategy: Determined from value, plant, and material group. A requisition subject to a strategy cannot be converted until every release code is set.

The background configuration behind these fields is covered in the purchasing and purchase requisition overview. This page focuses on the creation transaction itself.

Create a Purchase Requisition in SAP

Purchase requisition creation can be done in t-code ME51N (or the older version ME51 โ€“ not recommended) and is a straight forward process.

  1. Execute ME51N transaction.
  2. Purchase requisition document type: NB โ€“ standard.
  3. Source determination: ON or OFF.
  4. Header note.
  5. Material: material number.
  6. Quantity and UoM.
  7. Storage location: in which the material is stored.
  8. Vendor: automatically determined by using source determination โ€“ field number 3.
  9. Tracking number: covered in previous topics, a desired value can be entered manually.
  10. Valuation price: copied from material master data if maintained there, if not must be entered manually (if this field is not set as optional).

Create a Purchase Requisition in SAP

The screen above shows the numbered fields in the item overview. After entering the desired information in the fields, we can save transaction data.

Create a Purchase Requisition in SAP

The status bar confirms the requisition number assigned from the number range of the chosen document type.

๐Ÿ’ก Tip: Press the Check button before saving. It validates account assignment, delivery date, and source of supply in one pass, which is faster than discovering a missing entry after the document number has already been assigned.

Key Fields on the ME51N Screen

The ME51N screen is divided into a header, an item overview, and item detail tabs. The table below explains the entries that most often cause an error message.

Field Area Purpose Mandatory?
Document type Header Selects number range, field selection, and release strategy Yes
Source determination Header Lets SAP propose a vendor from source list, contract, or info record No
Material Item Links the item to master data and defaults description and unit No, if short text and material group are given
Quantity and unit Item Demand quantity; the unit defaults from the material master Yes
Delivery date Item Date the material is required; drives scheduling backwards Yes
Plant Item Receiving location; controls which master data applies Yes
Storage location Item Where the material will be stored on receipt No
Valuation price Item detail Estimated value used for release strategy determination Yes, unless configured optional
Requirement tracking number Item detail Free text key that links related documents for reporting No
Account assignment category Item Blank for stock; K, F, or A for direct consumption Conditional

Where a material has no master record, leave the material field empty and supply a short text plus a material group. This is the standard route for services and one off consumable purchases.

Purchase Requisition Transaction Codes and Next Steps

Creation is one transaction in a longer chain. The codes below cover the requisition from entry through to conversion.

Transaction Code Purpose
ME51N Create a purchase requisition
ME52N Change a requisition; a change to a strategy relevant field resets the release
ME53N Display a requisition in read only mode
ME54N Individual release of a requisition
ME55 Collective release of several requisitions
ME5A List display of requisitions by material, plant, or requisitioner
ME57 Assign a source and process the requisition interactively
ME58 Create purchase orders for requisitions that already carry a source
ME59N Automatic purchase order creation as a background job

Once released, the requisition is ready for the next stage. Continue with converting the requisition into a purchase order, or maintain a source list first if source determination returned nothing. Broader context is available across the SAP MM tutorial series.

FAQs

ME51N is the single screen enjoy transaction with header, item overview, and detail visible together. ME51 is the older multi screen version, kept only for compatibility and not recommended for new entry.

The item is flagged for deletion in ME52N rather than removed. A requisition item already converted into a purchase order cannot be flagged until the order item is deleted first.

Language models turn a written request into a structured item with material, quantity, and delivery date already filled. The requisitioner reviews the draft rather than typing every field manually.

Yes. Forecasting models read consumption history and seasonality, then raise requisitions ahead of a fixed reorder point. Planners approve the proposals, which shortens lead time on repeat purchases.

Yes. Plant is maintained per item, so a single document can request material for different plants. Release strategy is still evaluated per item, so approval paths may differ within one requisition.