Processo de controle de mudanças em engenharia de software com etapas
⚡ Resumo Inteligente
Change Control is the formal process a company uses to document, identify, and authorise changes to an IT environment, cutting the risk of unauthorised alterations, disruption, and errors across projects, applications, and infrastructure.
O que é controle de mudanças?
Controle de Mudanças é o processo que uma empresa usa para documentar, identificar e autorizar alterações to an IT environment. It reduces the chances of unauthorized alterations, disruption and errors in the system.
Por que mudar o controle?
Whenever stakeholders request new or different changes to the system, those changes are neither optional nor ignorable. The changes must be implemented without disrupting other components of the system. This is where change control becomes useful. It helps project teams modify project scope using defined controls and policies. Change Control is practiced whenever a project deviates from the plan.
A formal change request document must be completed and reviewed to keep control of every change request.
Common questions raised while analysing a change control request include:
- Quem aprovará a mudança?
- Does it need to be reviewed by a change control board?
- How much time is required to research and implement the change?
- Quais são os impactos das mudanças em outros componentes do sistema (cronogramas, custos, recursos, etc.)?
- Is there a threshold below which project management can approve it directly?
Different Factors of the Change Control Process
Existem vários fatores que um processo de Controle de Mudanças deve considerar
| Etapas no processo de controle de mudanças | Ação tomada no Controle de Mudanças |
|---|---|
| Iniciação e controle de solicitação de mudança | Change requests should be standardised and reviewed by management, and the requestor should be kept informed. |
| Avaliação impactante | Every change request should be assessed in a structured way to analyse potential impacts. |
| Controle e Documentação de Mudanças | A change log should record the date, the person who made the change, and the change itself. Only authorised individuals should be allowed to make changes, and a rollback process should be defined. |
| Documentação e procedimentos | Whenever system changes are implemented, the related procedures and documents should be updated to match. |
| Manutenção Autorizada | System access rights should be controlled to prevent unauthorised access. |
| Teste e aprovação do usuário | Software should be thoroughly tested, and business users should sign off before release. |
| Version Control | Production source code should be version controlled so only the latest approved build is deployed. |
| Mudanças de Emergência | A verbal authorisation should be obtained and the change documented as soon as possible. |
Processo de Controle de Mudanças
Before diving into the change control process, it is helpful to familiarise ourselves with the documents used in Change Control. Two documents are central to Change Control:
- Alterar o Registro: A change log lists details of every Change Request — project number, PCR (Project Change Request) ID, priority, owner, target date, status, status date, raised by, and date raised.
- Formulário de Solicitação de Mudança: It captures the details needed for decision making — type of change, benefits, requestor, time and cost estimate, priority, approver, and change request status.
Change Process Flow Diagram
The change process follows a specific pattern to implement changes in the product or system. The flow diagram below shows the steps involved.
Steps in the Change Control Process
| Etapas para controle de mudanças | Ação |
|---|---|
| Alterar identificação da solicitação | Identify the need for a change and describe it on the Project Change Request form. |
| Avaliação de solicitação de mudança | If the change is not valid, defer or reject it. Assign the resources needed to analyse the request, complete a quick impact assessment, and update the change request form. Rejected requests stop at this stage. |
| Análise de solicitação de mudança | Assign the change request to an authorised member for full analysis. Deferred changes re-enter this step, and rejected requests stop here. |
| Aprovação de solicitação de alteração | Identify the risk, complexity, and impact of the change before approval. Route the change request to the authorised approver for a decision. Rejected requests stop at this stage. |
| Implementação de solicitação de mudança | Update project procedures and management plans, inform the team, monitor progress, record completion, and close the change request. |
NOTA: Change Control approval may be granted by the Project Manager, IT Lead or Lead Developer, or a designated Stakeholder.
Change Management vs. Change Control
| Gestão de Mudanças | Controle de Mudança |
|---|---|
| Manages and controls change requests across IT infrastructure and services to minimise disruption and maximise business benefit. | Covers the submission, recording, analysis, and approval of a change to improve the overall performance of the system or product. |