ME23N v SAPObjednávka služby

⚡ Chytré shrnutí

Objednávka nákupu služby v SAP procures work rather than stock. Document type FO Framework Order with item category D and account assignment K books the cost directly to a cost center, and no goods receipt is required.

  • 🧾 Typ dokumentu: FO Framework Order carries a validity period, which a standard NB order does not.
  • 🔤 Klíčová kombinace: Item category D marks the item as a service and account assignment K sends the cost to a cost center.
  • ???? Services Tab: Individual service lines with quantity, activity unit, and price are maintained here rather than on the item overview.
  • 💷 Limits Tab: An overall limit caps unplanned services that were not specified when the order was raised.
  • ???? No Goods Receipt: The Goods Receipt flag is unticked on the Delivery tab because services carry no stock.
  • 🏦 Cost Assignment: A G/L account and cost center are mandatory, since there is no material master to derive them from.
  • 🔧 Same Maintenance: ME22N and ME23N change and display a service order exactly as they do a standard one.

Service purchase order in SAP ME23N

Co je objednávka služby?

Objednávky služeb se zadávají na služby, které jsou pořizovány interně nebo externě. Tyto nákupní objednávky se liší od standardních, protože nevyžadují příjem zboží, protože nemají žádné zásoby. Kromě toho existuje několik malých rozdílů ve vytváření PO. První je typ dokumentu pro tyto objednávky. Mělo by to být FO – Rámcová objednávka. Pro pořízení služby přímo pro nákladové středisko budeme postupovat podle níže uvedeného postupu.

Krok 1) Přejít na transakci ME21N.

  1. Zvolte typ dokladu FO – Rámcová zakázka.
  2. Vyberte prodejce.
  3. Vyberte začátek platnosti pro PO.
  4. Vyberte kategorii přiřazení účtu – K a kategorie položky – D.
  5. Zadejte popis služby.
  6. Zadejte množství a měrnou jednotku.
  7. Zadejte cenu za službu (např. 900 EUR za 1 AU – jednotku aktivity).

Objednávka nákupu služby v SAP

Krok 2) Na úrovni položky existuje několik polí, která musíte udržovat, abyste vytvořili platnou objednávku pro službu. Na záložce „Služby“ zadejte informace o vaší službě, množství a ceně.

Objednávka nákupu služby v SAP

Můžete být vyzváni k zadání informací o přiřazení účtu.

Krok 3) Zde můžete zadat účet hlavní knihy (ve většině případů bude navrženo) a nákladové středisko pro náklady na služby, které mají být přiřazeny.

  1. účet hlavní knihy.
  2. Nákladové středisko.

Objednávka nákupu služby v SAP

Krok 4) Na záložce Limity můžete zadat limit pro neplánované služby. Očekávaná hodnota, kterou by služby neměly překročit.

Objednávka nákupu služby v SAP

Krok 5) Nyní zvolte záložku Doručení a zrušte zaškrtnutí políčka Příjem zboží. Služby nemají Příjem zboží protože nejsou relevantní pro řízení zásob (nemají zásoby).

Objednávka nákupu služby v SAP

Krok 6) Karta Přiřazení účtu zobrazuje informace, které jsme byli požádáni o zadání, ve vyskakovacím okně. Pokud nebudete vyzváni k zadání prostřednictvím vyskakovacího okna, můžete zadat informace zde.

Objednávka nákupu služby v SAP

Krok 7) Nepotřebujeme skladovací místo pro naši položku, protože není relevantní.

Objednávka nákupu služby v SAP

Můžete uložit své změny a získat číslo dokumentu.

Objednávka nákupu služby v SAP

Změna a režim zobrazení jsou přístupné prostřednictvím stejných transakcí jako u standardu nákupní objednávka, ME22N a ME23N.

Item Category D and Account Assignment K Explained

These two single letter fields do most of the work on a service order, and entering the wrong combination is the usual reason the Services tab never appears.

Item category D – Service. Setting D tells SAP the item describes work rather than material. Three things change immediately: the Services tab becomes available for entering individual service lines, the Limits tab becomes available for unplanned work, and inventory management is switched off for the item.

Account assignment category K – Cost center. Because a service is consumed the moment it is performed, it never enters stock and therefore has no stock account to post to. K directs the cost to a cost center and demands a G/L account. Other categories serve different receivers:

  • K – Cost center: Routine services such as maintenance, cleaning, and consultancy.
  • F – Order: Work belonging to an internal order or maintenance order.
  • P – Project: Services charged to a WBS element in Project System.
  • A – Asset: Work capitalised onto a fixed asset rather than expensed.

The pairing matters. Item category D without an account assignment category leaves SAP with no receiver for the cost, and the order cannot be saved. Cost center master data is covered in creating a cost center.

How a Service PO Differs from a Standard PO

Most of the ME21N screen looks familiar, but six behaviours change once item category D is used.

Parametr Standard purchase order Service purchase order
Typ dokumentu NB, no validity period FO Framework Order with validity start and end
Kategorie položky Blank, standard D, service
Material master Obvykle vyžadováno Not used; a short text and service lines instead
Receipt of performance Goods receipt in MIGO Service entry sheet in ML81N
Stock effect Increases inventory None, cost is expensed on acceptance
Umístění skladu Požadovaný Irelevantní
Unplanned spend Nehodí Controlled by the overall limit on the Limits tab

The validity period on an FO order is what makes it a framework. Services can be called off repeatedly against it until either the validity date passes or the limit value is consumed.

Service Entry Sheet: Confirming Services Received

The article above ends at saving the order, but the order alone commits nothing to accounting. Because there is no goods receipt, the service entry sheet is what records that work was actually performed and releases the cost. Skipping it leaves the invoice with nothing to match against.

  1. Open transaction ML81N. Enter the service purchase order number and, where the order has several lines, the item to be confirmed.
  2. Create a new entry sheet. Give it a short text describing the period or the work completed, for example the month being billed.
  3. Adopt the planned services. Use Service Selection to pull the lines already specified on the order, then enter the quantity actually delivered. Partial confirmation is normal for a framework order.
  4. Add unplanned services if required. Work not foreseen when the order was raised is entered directly on the entry sheet. The total is checked against the overall limit and rejected if it exceeds it.
  5. Check the account assignment. The cost center and G/L account default from the order item and can be split across several receivers if the work benefited more than one department.
  6. Accept the entry sheet. Acceptance is the moment the cost posts. It creates a material document and an accounting document that debits the cost center and credits the GR/IR clearing account, exactly as a goods receipt would for material.

Acceptance can be subject to its own release strategy, in which case ML85 handles collective release before the cost is posted. Only after acceptance does invoice verification find a quantity to match, and any variance blocks the document until someone can vydat fakturu. Related material is covered across the SAP MM tutoriál série.

Nejčastější dotazy

Item category D has not been set on the item. Without it SAP treats the line as material, so the Services and Limits tabs never appear and no service lines can be entered.

No. A short text with quantity and price is enough for one off work. A service master created in AC01 is worth maintaining only for services purchased repeatedly.

AI monitors unplanned service lines against the order limit and flags entry sheets that trend toward the cap, giving the buyer time to renegotiate before the framework is exhausted.

Yes. Models compare confirmed hours and rates with the agreed terms and past entry sheets, flagging duplicated lines or rates that exceed what was contracted before acceptance posts the cost.

SAP rejects the entry sheet. Either increase the limit on the order in ME22N, which may trigger release again, or split the excess work onto a new purchase order.