1) Quality Center is
an ERP
a standalone software
a web based (client/server) tool
a script
2) Traceability Alert is depicted with a "@"
Yes
No
3) For Test Plan Module , select the correct folder heirarchy
Subject - Tests - Test Step
Subject - Test Steps - Step
Requirements - Tests - Test Steps
Requirements - Subject - Tests - Test Steps
4) Which Tab allows to configure conditional exectuion of Tests
Hint : Conditions like Test # 2 can be executed only if Test # 1 is completed
Execution Flow
Design
Attachments
None of The Above
5) Test Cases created in Word / Excel can be uploaded in QC ?
YES
NO
6) Types of Graphs available in QC
Reports
Graphs
Live Analysis Graphs
All Of the Above
7) Follow Up Alert can be created on
A Test in Test Plan Tree
A Test Instance in Execution Grid
A Defect in Defects Grid
All Of the Above
8) Favorites are almost always are High Priority Defects
Hint : User can mark a defect as favorite for easy tracking. A favorite can be PUBLIC or PRIVATE
Yes
No
9) In QC, Requirements & Test Plan can be linked ?
Only Child Requirements
Only Parent Requirements
Both Child & Parent Requirements
Niether Child nor Parent Requirements
10) In Test Lab Module , is it possible to store separate results for the SAME test case run at different dates and times ?
YES
NO
11) Which of the Below is NOT a module in Quality Center
Requirements
Business Component
Defects
Automation
12) Defect can be linked to
Tests & Test Steps
Run & Run Steps
Requirements
All Of the Above
13) Test Cases can be added in Test Lab Module from
Requirements Module
Defects Module
Test Plan Module
All Of the Above
14) Data is DYNAMICALLY updated in
Reports
Graphs
Live Analysis Graphs
None Of the Above
15) Is is possible to link a single defect to multiple test cases ?
Yes
No
MAYBE. Depends on the TYPE of Defect
16) Which Tests can be scheduled to be run at a specific Date and Time ?
Manual Test Cases
Automated Test Cases
Both Manual & Automated Test Cases
Niether Manual nor Automated Test Cases
17) In Test Lab Module
Tests are created
Tests are executed
Tests are created and executed
18) Results of an AUTOMATED test case are stored in
Automation
Test Plan
Test Lab
None of The Above
19) An Instance is
A copy of the Requirement
A copy of Test Case
A Copy of Defect
A copy of Email
20) Quality Center is a
Defect Tracking Tool
Requirements Management Tool
Test Planning Tool
Comprehensive Test Management Tool